Published 10/2022
MP4 | Video: h264, 1280×720 | Audio: AAC, 44.1 KHz, 2 Ch
Genre: eLearning | Language: English | Duration: 29 lectures (8h 24m) | Size: 3.86 GB
ETO – Product Costing flow for Engineer-to-Order production-Production Process using Projects ,WBS Elements and Networks
What you’ll learn
Step by step by configuration for Product costing
Step by step by configuration for Product costing with PS module relating to ETO scenarios
SAP CO: Product Costing flow for ETO Scenario with Production order
SAP CO: Product Costing flow for ETO Scenario without Production order
Requirements
SAP FI & CO-Product costing and little bit PS modules are required.
Description
SAP S/4 HANA 2021: CO Product Costing flow for ETO Scenario
Normally, If companies following manufacturing process link with WBS , Networks then we can suggest it as CO Product Costing flow for ETO Scenario
As per my practical exposure here in ETO identified two types of ETO Process
a). ETO Production process with Production Order
b). ETO Production process without Production Order
A). ETO Production process with Production Order
For every sales order automatically created one WBS element for which we need to do design Standard Project, WBS and Network and link to ETO process material
In this process like other production order here also we need to design BOM, Routing and the followed by Production order with respect to WBS which will be created automatically
then Goods issue ( Input material consumption) and Activity confirmation to production order and Goods Receipt with respect WBS element can do. and finally we will calculate variance if any between plan & actual and the settlement.
This process as we discussed with valuated so Goods receipt and Delivery will be there we can collect actual COGS and will be updated for WBS Element.
Once billing done revenue will be captured , then we can analyze profit/loss between revenue and cogs by WBS RA key calculation and settle to COPA (either Account based or Costing based) , here i used account based COPA only.
A). ETO Production process without Production Order (means Material cost book to WBS and Activities book to Network)
Here also process like above 1 st, for every sales order automatically created one WBS element for which we need to do design Standard Project, WBS and Network and link to ETO process material
In this process there is no production order here. We also need a work center for each activity like Machine. Labour etc.. then Actuals book like Goods issue ( Input material consumption) to WBS element and Activity confirmation to Network.
This process is non valuated so No Goods receipt and Delivery will be there and we can collect actual while calculation WBS RA key calculation
Once Sales order related Billing done and Revenue (without delivery)will be captured , then we can analyze profit/loss between revenue and cogs by WBS RA key calculation and settle to COPA (either Account based or Costing based) , here i used account based COPA only.
Who this course is for
CPA , CMA , ACCA , CA , MBA , M Com, B Com students and Professionals, SAP FICO Consultants and End Users.
HOMEPAGE
https://anonymz.com/?https://www.udemy.com/course/sap-s4-hana-2021-co-product-costing-flow-for-eto-scenario/
Reviews
There are no reviews yet.